top of page

ENLARGED CITY SCHOOL DISTRICT OF TROY

High School HVAC Reconstruction - Construction $9 Million, Completed November 2019

  • Conversion of HS from Steam to Hot Water

  • New Chilled Water Cooling Plant

  • New Ventilation Systems

District Wide Technology Upgrade

  • District wide technology infrastructure upgrades similar to recent Doyle Middle School installations, including security, door access, voice, communications cabling, smart classroom technology, Cisco TelePresence MX800 Installations, etc.  (2016) Construction $7 Million

Doyle Middle School

  • Engineered Solutions performed full plumbing, mechanical, electrical and technology systems design for $54 Million renovation of the Doyle Middle School in Troy, NY.

  • The design included a four pipe hot water/chilled water HVAC system with a new chilled water plant.  Variable air volume, heat recovery, variable speed pumping, and direct digital controls were designed to achieve a high level of energy efficiency.  This system was responsible for the district to receive tens of thousands of dollars in grants from NYSERDA.

  • Energy efficient lighting, a standby generator system, a new electrical service, new fire alarm, new public address system, and completely new power distribution infrastructure was also incorporated in our design.  New plumbing systems were designed for the entire facility, including a new pool filtration system.  State of the art communications technology, IP phone, and IP security systems infrastructure was also designed by our office for this project.  

High School & Athletic Fields

  • Complete renovation of school athletic facilities including locker rooms, athletic fields and gymnasium.  Construction 2012.

bottom of page