K-12 CLIENT LIST 

Lansingburgh Central School District

Lansingburgh, NY

lansingburgh csd.jpg
  • Turnpike Elementary School Additions & Reconstruction 2018, Construction $13.9 Million

  • Middle School Boiler Replacement Project 2018

  • Junior High School Kitchen & Cafeteria, High School Kitchen 2014, Construction $1.7 Million

  • High School Press box 2014

Capital Improvement Project 2012

  • MEP design services for $18.5 Million reconstruction project for all district buildings, consisting of mechanical and heating systems including controls upgrades, electrical power system upgrades including panelboard replacements, gymnasium and classroom lighting upgrades, and district wide wireless clock system.  

  • Project also included design services for new sports field complex in coordination with Appel Osborn, consisting of new sports field lighting, press box, and maintenance storage building.  

Glens Falls City School District 

Glens Falls, NY

glens falls.jpg

Cairo-Durham Central School District

Cairo, NY

Cairo-Durham.jpg
  • Phases 1 & 2 Reconstruction and Alterations at Multiple District Buildings (2018), Estimated Construction $4.9 Million includes infrastructure upgrades to hvac equipment including boilers and DDC systems, fire suppression, plumbing piping and fixtures, lighting, fire alarm systems, PA and master clock systems.  

  • Reconstruction and Alterations Phase 2 at Multiple District Buildings (2015), Estimated Construction $3.3 Million.  Miscellaneous plumbing, hvac, electrical and communications infrastructure renovations at multiple district buildings.  

  • Reconstruction and Alterations Phase 1 at Multiple District Buildings (2014), Estimated Construction $1.8 Million.  Miscellaneous mechanical, and electrical renovations to multiple district buildings.  

  • MS/HS Concession Stand, Press Box & Fields - Construction $2.7 Million.  Engineered Solutions completed MEP design of new Sports Field Complex in coordination with Appel Osborne and Mosaic Associated.  Design included new sports field lighting, scoreboards, and concession building.  Completed Fall 2009.

  • HS Reconstruction - Construction $8.2 Million; Pool filtration and dehumidification systems replacement, miscellaneous reconstruction, auditorium reconstruction and theatrical systems replacement.  Pool Data:  Six lane 141,888 gallon swimming pool; design included new main drains in pool and relined entire main drain pipe installed below the pool.  Installed ne deck drains, filter room backwash pit sump pumps, pool heater, pool and filter room ventilation system, power and lighting.  Completed 2008.

  • Reconstruction Work Phase II (2016) Estimate $2.2 Million.  Miscellaneous Plumbing, HVAC and Electrical system upgrades.  

  • Miscellaneous Reconstruction Work at District Buildings (2015) Construction $627K Plumbing, HVAC and Electrical work for miscellaneous reconstruction.

  • Miscellaneous Reconstruction Work at District Buildings (2012), Construction $306K.  Miscellaneous Electrical renovations to district buildings.  

  • Fuel Tank Reconstruction at Cairo Elementary School (2013, Construction $215K.

  • Additions & Reconstruction (2008) Construction $3.1 Million.  Science Labs, technology rooms, art rooms, boiler replacement.  

  • IDEA & Technology Renovation Grant (2004) Construction $2.4 Million.  Multiple building main distribution panel replacement and service entrance upgrade.  New and existing water supply well upgrade.  

Voorheesville Central School District 

Voorheesville, NY

voorheesville.jpg
  • High School (2010) - Conversion of Chemistry lab to Physics

  • Elementary School (2010) - Boiler room drainage reconstruction

  • Elementary School Reconstruction (2007) - Construction $3.7 Million.  Heating system replacement, DDC temperature controls, MDP, electrical distribution and fire alarm system replacement, selected lighting replacement.  

Lansingburgh Central School District

Lansingburgh, NY

lansingburgh csd.jpg
  • Turnpike Elementary School Additions & Reconstruction 2018, Construction $13.9 Million

  • Middle School Boiler Replacement Project 2018

  • Junior High School Kitchen & Cafeteria, High School Kitchen 2014, Construction $1.7 Million

  • High School Press box 2014

Capital Improvement Project 2012

  • MEP design services for $18.5 Million reconstruction project for all district buildings, consisting of mechanical and heating systems including controls upgrades, electrical power system upgrades including panelboard replacements, gymnasium and classroom lighting upgrades, and district wide wireless clock system.  

  • Project also included design services for new sports field complex in coordination with Appel Osborn, consisting of new sports field lighting, press box, and maintenance storage building.  

Marion Central School District

Marion, NY

Marion csd.jpg
  • Completed the design of a $1.2 Million Technology upgrade that included new 10GB Ethernet Network, 802.11n wireless network, VOIP telephone system and Interactive White Boards in all classrooms in the district.  The project was completed in 2009.

Honeoye Falls Central School District

Honeoye, NY

Honeoye CSD.jpg
  • Included a new district wide VOIP system and Category 6 data wiring.  The project was completed in 2009.

Highland Central School District

Highland, NY

Highland csd.jpg
  • Excel Reconstruction Project (2009) - Construction $1.5 Million.  DDC Controls, exit and emergency lighting.

Fort Ann Central School District

Fort Ann, NY

Fort Ann CSD.jpg
  • Fueling Station (2006) - Construction $133K.

  • Additions & Reconstruction (2004) - Construction $9.0 Million.  Auditorium and classroom additions, existing building reconstruction, district wide technology infrastructure, VOIP telephone, heating system conversion, new DDC controls.  

  • Energy Performance Contract (2004) - Construction $500K.  Heating system conversion from electric to hot water & lighting replacement.  