top of page

K-12 CLIENT LIST

Lake Placid School District

Lake Placid, NY

lake placid.jpg
  • HS Chimney Reconstruction (2011)

  • Generators and Athletic Building (2007), Construction $1.8 Million.  New standby generator for elementary school and new automatic transfer switch for high school.  

Ellenville Central School District

Ellenville, NY

Ellenville csd.jpg
  • Solar Thermal Domestic H.W. Design (2011) - Construction $250K

  • Fuel Tank Replacement (2009) - Construction $303K.

Fort Edward Central School District

Fort Edward, NY

Fort Edward.jpg
  • Engineered Solutions designed a $1.4 Million technology upgrade that included Interactive whiteboards in all classrooms, wireless network throughout the building, VOIP telephone system and data network upgrades.  

Middleburgh Central School District

Middleburgh, NY

middleburgh csd.jpg
  • Additions & Reconstruction (2009) Construction $3.3 Million.  

Taconic Hills Central School District

Craryville, NY

Taconic Hills SD.jpg
  • Engineered Solutions designed a $2.2 Million technology upgrade including a new network operating center, wireless network throughout the building, IP based security system, VOIP telephone system and data network upgrades.  Project completed 2011.

Ballston Spa Central School District

Ballston Spa, NY

Ballston Spa CSD.jpg
  • Technology upgrades at Wood Road, Malta Avenue and Milton Terrace Elementary School 2014-2015

  • Communications systems design at the new elementary school builidng:

    • IP based security system​

    • Structured cable plant

    • Wired and Wireless Ethernet network

    • IPTV system

    • VOIP telephone system

    • Multi-media classroom technology equipment

  • New High School (1999) - Construction $45 Million; Mechanical, Electrical and Communications systems design including integrated 900KW cogeneration system for new 230,000 sq. ft. high school building.  Project also included Middle School additions and reconstruction. 

Shelter Island Union Free School District

Shelter Island, NY

Shelter Island.jpg
  • Miscellaneous Alterations (2013) - Construction $2.3 Million.  Design includes new temperature control system, standby generator, power distribution upgrades and new water storage system and distribution. 

Schalmont Central School District

Schenectady, NY

Schalmont CSD.jpg
  • Capital Improvements Project (2013) - Engineered Solutions designed district wide VOIP telephone system $138K

Mineola Union Free School District

Mineola, NY

Mineola_Middle-School.jpg
  • District Wide Door Access (2008) - Construction $120K

  • Middle School HVAC Reconstruction (2007) - Construction $2.1 Million

  • High School Auditorium Reconstruction (2006) - Construction $1.7 Million

  • Middle School Cafeteria, Library and Classrooms (2006) - Construction $5.9 Million

Long Beach Public Schools

Lido Beach, NY

Long Beach PS.jpg
  • Electrical design for field lighting at the High School and Middle School

  • Study and report for district wide technology upgrades

bottom of page